# intake.md — Aceves Hubbard Lake Dock (2026)

**Status:** 🟦 **STUB — BLOCKED on Sam-input** · scaffolded 2026-05-29 to give the ask a substrate home
**Kind:** customer-job-exploration (may move to `customer-jobs/` once scope confirmed)
**Owner:** Sam (Same Solutions)
**Customer:** Jon Aceves (jon-aceves)

## Why this file exists

The "Hubbard Lake deck" was referenced in `bk-P2-PAINT-LESSONS-LEARNED` as the next Aceves work after the paint close-out ("write paint lessons BEFORE Hubbard Lake deck starts"). The 2026-05-28 state survey flagged it as having zero substrate coverage. Also referenced in Sam-and-planning-chat as a "dock ask" — terminology may be deck OR dock; **stub uses "dock" per Sam's most recent framing** but the structural fix should clarify.

## Terminology note

- "Hubbard Lake **deck**" — `bk-P2-PAINT-LESSONS-LEARNED` description (suggests wood-deck construction or refinishing)
- "Hubbard Lake **dock**" — Sam's 2026-05-29 resume-prompt framing (suggests waterfront dock work — installation, repair, refinishing)

These are different jobs (a deck is a structure attached to the house; a dock is on the water). Sam: confirm which one is the actual ask, or whether both are in scope.

## What Sam owes the substrate to unblock

- [ ] **Deck vs dock** — see above; which one (or both)?
- [ ] **Scope** — new build / repair / refinishing / staining / structural inspection?
- [ ] **Customer relationship** — paid job, favor, referral?
- [ ] **Property specifics** — Jon's Hubbard Lake property (separate from `aceves-home` and `aceves-lake` if those are different — confirm).
  - Manage-app data has `aceves-lake` property; this might be it, or it might be a third Aceves property.
- [ ] **Location / access** — Hubbard Lake MI is ~2.5 hours north from Commerce Township; remote-work timing affects materials staging + travel rates.
- [ ] **Timing / urgency** — northern Michigan lake-season is shorter (typically mid-May to early October); is there a target completion date?
- [ ] **Helper coordination** — `bk-P2-PAINT-LESSONS-LEARNED` notes Keith agreed to help with the Aceves deck (SS-Q008 originally referenced in CLAUDE.md as "Keith agreed to help with Aceves deck, rate TBD"). Confirm: is Keith still in for this one?
- [ ] **Quote relationship** — there's an active `SS-Q008` for Jon Aceves at `aceves-lake` ($16,886) per CLAUDE.md "Active Quotes" table. Is the dock ask part of SS-Q008, a supplement, or distinct?

## Sections to fill once unblocked

- ## Scope (deck / dock / both)
- ## Property specs (location, materials, dimensions)
- ## Materials list
- ## Quote / pricing (relationship to SS-Q008)
- ## Schedule
- ## Helper coordination (Keith?)
- ## Status updates

## Disposition

If this turns into a real customer-job, move this folder to
`customer-jobs/aceves-hubbard-dock-2026/` (or `-deck-` if that's the correct name) and add an `index/customer-job/` index entry. Until then, it lives under `personal/` as an intake-only stub.

## Related

- Aceves Four Winns (sibling stub): [`personal/aceves-fourwinns-service-2026/intake.md`](../aceves-fourwinns-service-2026/intake.md)
- Aceves paint close-out (precursor + lessons-learned source): [`customer-jobs/aceves-home-fence-2026-04/`](../../customer-jobs/aceves-home-fence-2026-04/index.html) and [`customer-jobs/aceves-home-fence-2026-04/lessons-learned.md`](../../customer-jobs/aceves-home-fence-2026-04/lessons-learned.md) (scaffolded 2026-05-29 — Sam to fill)
- Canonical issue: `bk-P2-PAINT-LESSONS-LEARNED` (P2 open in `data/issues.json`) — write Aceves paint lessons-learned **BEFORE Hubbard Lake deck starts**. That gating order assumes Sam wants the lessons to inform the dock estimate; surface here for Sam-decision.
- Active quote: **SS-Q008** ($16,886, `aceves-lake`, status: pending) per top-level CLAUDE.md. Relationship to this dock ask: TBD.
