📋 Backlog Board — prioritized work queue

One place to pick the next thing to knock out · built 2026-07-06 · pulls from awareness-backlog, issues.json, this-week, and open SAM-FILL flags
Companion to the this-week tracker (tickable, time-boxed). This board is the fuller prioritized queue across all areas. Canonical issue registry = data/issues.json; this is a curated Sam-facing view.

⭐ TOP 3 to knock out next (Sam's judgment calls)

  1. GM applications — TODAY. Apply to the Battery Calibration TS role + message Luke and Adam. Time-boxed to today; lead with AI usage. Highest-leverage, expires if it slips.
  2. Robo follow-through. Capture the 7/1 meeting outcome (recap + next steps + comp) while fresh, and prep to meet David DiMeo (co-founder) this week. Two-irons-in-the-fire with GM = leverage.
  3. Collect outstanding invoices. Letvin $695 + Talmid $813 = ~$1,500 already earned, sitting in AR. One or two follow-up calls = money in the door. Cheap fridge quick-win alongside: shake-test the ~$20 start relay.

⚠ Time-sensitive / this week

ItemStatus → next actionPri
GM appsAPPLIED to 2 roles (Milford, hybrid): TS Battery State Estimation (JR-202611969, 7/6) + Sr SSLE HV Battery Mgmt (JR-202612558, 7/7). Senior IC -> comp anchor L7 $140-190K. Next: message Luke/Adam + prep interviews (C/C++ framing for TS). details.P1
Robo — 7/1 recapMeeting happened Wed 7/1 (John + Dom). Capture outcome / next steps / comp while fresh. SAM-FILL recap.P1
Robo — meet DavidMeet David DiMeo (co-founder) this week. Prep: review company-research.html. SAM-FILL day/time.P1
Robo — await contactExpect John or Dom to reach out this week (follow-through / David intro). Track; nudge if quiet.P2
Progressive claimTruck incident 6/28 (ticket paid). Follow up on claim status.P1
CeCe / MedicaidER 6/28 (elbow bursitis), no insurance at visit. Track that Medicaid reaches her; help enroll for the bill.P1
Car registrationsBoth vehicles due (issue, P1/high, open). Renew.P1
Catherine HoweTherapy Thu 7/9 11:00 AM (standing weekly).P2

💰 Money / business

ItemStatus → next actionPri
Letvin AR $695SS-Q002 shop work outstanding (issue, open). Collections follow-up call.P2
Talmid AR ~$813Outstanding balance. Follow up to collect. SAM-CONFIRM exact figure vs invoices.P2
Lazar bathroomPaying job (now a /manage customer, deployed). Finish framing/plumbing + confirm shower kit, then invoice.P1
Peter Scott shedProposal is send-readySEND it to open the job.P2

🔨 Active projects

ItemStatus → next actionPri
Fridge repairCONFIRMED 7/7: DEFROST system failure (evaporator ice block blocked airflow -> both sections warm). Compressor overworked not failed; relay/capacitor RULED OUT. Temp hair-dryer melt done (frost rebuilds ~2-3 days). Real fix: (A) defrost thermostat + heater ~$40 shotgun, (B) test+replace bad one, (C) limp w/ manual defrosts. Garage-bound. SAM-FILL option A/B/C + multimeter results.P1
Fridge replacementPURCHASED 7/8 + IN PLACE (dolly): Bosch B36CT81ENS (36" counter-depth French-door, 20.8 cu ft) from Gilbert's, floor model ~$2,600. Finish: pull 2 upper cabinets, measure opening (≥36"W/72"H + 1" airflow), run water line, level; upright ~24h if it rode lying down. specs + install.P1
Kitchen layoutNo layout/move-plan doc exists yet. Start one: walls, current positions, new fridge + oven locations, opening dims, water/gas/electrical. Blocks sizing the new fridge.P2
DDR grill mountRegulator ordered (B09VKZGRJC). Needs the pontoon MOUNT: SAM-FILL bracket photo + rail measurements.P2
Pontoon bunk carpetBuy marine bunk carpet (Menards first) + stainless staples; finish stapling + jet-ski hoist bunks.P3
Foran XR caseReady to print — queue it.P3
BoatsFour Winns open items + 4 AWG marine lugs; Mercury 90 battery (EverStart Maxx Grp 24); jet ski start-on-hose.P2
Mower brakesOrder John Deere mower spindle brakes (issue, open).P3

📱 App / substrate

ItemStatus → next actionPri
Website deployDONE 2026-07-06: Lazar customer + bug-(a) name fix live (v1.7.24, sw v60). Verify in /manage that names show + Lazar appears.P3
Firebase Stage BHELD until after the Robo/GM week (Sam's call). Nothing executed; SAFE-PREP-only. Run via the copy-paste kit when ready.P2
Bug-(b) $0 financialsBlob-dependent (2026-06-01 scrub deleted the seed jobs). SAM: run the localStorage console check on your device to see if jobs survived; else it's a Stage B read + re-migrate.P2
IA-map consolidation7 propose-only suggestions (P0-b customer store, retire status-tracker, etc.). Ready when Sam wants to action any. ia-map.P3
Substrate maintenance~30 internal Phase-3/4 + housekeeping issues in data/issues.json (auto-maintenance, renderers, audits). Background; not Sam-blocking.P3

🏠 Household / personal

ItemStatus → next actionPri
Fridge / kitchenSee Active projects — relay try + kitchen layout start.P2
Catherine HoweThu 7/9 11 AM (standing).P2
Win itemsSoccer nets, tool-knowledge upgrades (low priority, open issues).P3
Backlog board · built 2026-07-06 · curated Sam-facing view (canonical registry = data/issues.json) · pair with this-week · Sam's private page (noindex) · Same Solutions substrate.