data/issues.json; this is a curated Sam-facing view.| Item | Status → next action | Pri |
|---|---|---|
| GM apps | APPLIED to 2 roles (Milford, hybrid): TS Battery State Estimation (JR-202611969, 7/6) + Sr SSLE HV Battery Mgmt (JR-202612558, 7/7). Senior IC -> comp anchor L7 $140-190K. Next: message Luke/Adam + prep interviews (C/C++ framing for TS). details. | P1 |
| Robo — 7/1 recap | Meeting happened Wed 7/1 (John + Dom). Capture outcome / next steps / comp while fresh. SAM-FILL recap. | P1 |
| Robo — meet David | Meet David DiMeo (co-founder) this week. Prep: review company-research.html. SAM-FILL day/time. | P1 |
| Robo — await contact | Expect John or Dom to reach out this week (follow-through / David intro). Track; nudge if quiet. | P2 |
| Progressive claim | Truck incident 6/28 (ticket paid). Follow up on claim status. | P1 |
| CeCe / Medicaid | ER 6/28 (elbow bursitis), no insurance at visit. Track that Medicaid reaches her; help enroll for the bill. | P1 |
| Car registrations | Both vehicles due (issue, P1/high, open). Renew. | P1 |
| Catherine Howe | Therapy Thu 7/9 11:00 AM (standing weekly). | P2 |
| Item | Status → next action | Pri |
|---|---|---|
| Letvin AR $695 | SS-Q002 shop work outstanding (issue, open). Collections follow-up call. | P2 |
| Talmid AR ~$813 | Outstanding balance. Follow up to collect. SAM-CONFIRM exact figure vs invoices. | P2 |
| Lazar bathroom | Paying job (now a /manage customer, deployed). Finish framing/plumbing + confirm shower kit, then invoice. | P1 |
| Peter Scott shed | Proposal is send-ready — SEND it to open the job. | P2 |
| Item | Status → next action | Pri |
|---|---|---|
| Fridge repair | CONFIRMED 7/7: DEFROST system failure (evaporator ice block blocked airflow -> both sections warm). Compressor overworked not failed; relay/capacitor RULED OUT. Temp hair-dryer melt done (frost rebuilds ~2-3 days). Real fix: (A) defrost thermostat + heater ~$40 shotgun, (B) test+replace bad one, (C) limp w/ manual defrosts. Garage-bound. SAM-FILL option A/B/C + multimeter results. | P1 |
| Fridge replacement | PURCHASED 7/8 + IN PLACE (dolly): Bosch B36CT81ENS (36" counter-depth French-door, 20.8 cu ft) from Gilbert's, floor model ~$2,600. Finish: pull 2 upper cabinets, measure opening (≥36"W/72"H + 1" airflow), run water line, level; upright ~24h if it rode lying down. specs + install. | P1 |
| Kitchen layout | No layout/move-plan doc exists yet. Start one: walls, current positions, new fridge + oven locations, opening dims, water/gas/electrical. Blocks sizing the new fridge. | P2 |
| DDR grill mount | Regulator ordered (B09VKZGRJC). Needs the pontoon MOUNT: SAM-FILL bracket photo + rail measurements. | P2 |
| Pontoon bunk carpet | Buy marine bunk carpet (Menards first) + stainless staples; finish stapling + jet-ski hoist bunks. | P3 |
| Foran XR case | Ready to print — queue it. | P3 |
| Boats | Four Winns open items + 4 AWG marine lugs; Mercury 90 battery (EverStart Maxx Grp 24); jet ski start-on-hose. | P2 |
| Mower brakes | Order John Deere mower spindle brakes (issue, open). | P3 |
| Item | Status → next action | Pri |
|---|---|---|
| Website deploy | DONE 2026-07-06: Lazar customer + bug-(a) name fix live (v1.7.24, sw v60). Verify in /manage that names show + Lazar appears. | P3 |
| Firebase Stage B | HELD until after the Robo/GM week (Sam's call). Nothing executed; SAFE-PREP-only. Run via the copy-paste kit when ready. | P2 |
| Bug-(b) $0 financials | Blob-dependent (2026-06-01 scrub deleted the seed jobs). SAM: run the localStorage console check on your device to see if jobs survived; else it's a Stage B read + re-migrate. | P2 |
| IA-map consolidation | 7 propose-only suggestions (P0-b customer store, retire status-tracker, etc.). Ready when Sam wants to action any. ia-map. | P3 |
| Substrate maintenance | ~30 internal Phase-3/4 + housekeeping issues in data/issues.json (auto-maintenance, renderers, audits). Background; not Sam-blocking. | P3 |
| Item | Status → next action | Pri |
|---|---|---|
| Fridge / kitchen | See Active projects — relay try + kitchen layout start. | P2 |
| Catherine Howe | Thu 7/9 11 AM (standing). | P2 |
| Win items | Soccer nets, tool-knowledge upgrades (low priority, open issues). | P3 |