# Monday progress — as of ~1:00 PM, May 11 2026

Snapshot of what's shipped today, what changed, what's still queued for tonight.

## Commits today

### Substrate (samesolutions-equipment-service): 33 commits since 00:18 EDT

**Late-night batch (00:18 – 04:55, 21 commits)** — overnight planning + scaffolding:
- Pirates necklace v3 → v3.1 (bug fixes) → v3.2 (pause Z fix + ~10% faster/lighter)
- Pirates+Phillies cost analysis with verified $1.35/$0.95 unit cost
- Status tracker v3 with 8+8 plan + cost/profit/sales analysis
- Hub substrate (`index.html`) — visual landing page for all projects
- Calendar substrate with week/day/month views
- Multicolor-without-AMS reference guide v1.1
- Friends-meeting-prep v2 → v3 → v3.1 (catalyst ideas, MI+PA hub model, slide outline, pre-read brief)
- Peter Scott shed customer-job scaffold + appointment prep
- SW paint walk-in sheet v2 (4-color Aceves master)
- Passive-income-automation-research scaffold
- Home tab design spec for manage app
- Metal-3DP decision log refresh

**Morning batch (10:09 – 10:24, 4 commits)** — sync corrections:
- Pirates v3.2 finalized
- Peter Scott appointment moved Mon 5/11 → Tue 5/12 TBD across 7 active files
- Jonathon Aceves formal-name correction (Jon colloquial preserved)
- Morning-brief-current.md replacing stale v2

**Midday batch (12:29 – 12:53, 4 commits)** — live ops tooling:
- Calendar v3 with dynamic NOW indicator (banner, now-line, past/current/next)
- Hub Now/Next panel (live JS-driven schedule on substrate root)
- Aceves paint handoff block at `/handoff-blocks/aceves-paint-2026-05-11.md`
- Status tracker pending items (pressure wash, insurance, CeCe tax, Thursday therapy)

### Website (samesolutionsllc-website): 3 commits today
- CHANGELOG: Monday operations checkpoint
- PLANNER: Monday vs Tuesday day labels, Peter Scott Green Oak address, manage-app TODO
- PLANNER: refresh for week May 11-15

## Major workflow improvements landed today

1. **Live "where you are" UI** — Calendar v3 + hub Now/Next panel give Sam a phone-glanceable view of "current event, next event, remaining items" that updates every 60s and on visibility change. Replaces the static brief-only flow.

2. **CC permissions silent** — auto-approve allowlist in `~/.claude/settings.json` confirmed working in this session (0 prompts across 30+ tool calls). Rules doc at `/handoff-blocks/cc-permissions-rules.md` for future reference.

3. **Brush-wrap workflow documented** — Aceves handoff captures the print-pause-paint workflow (plastic-wrap brushes during 5-min print swap runs) so it's a transferable technique, not tribal knowledge.

4. **Source-of-truth boundary held** — Peter Scott Tue/Wed correction was synced across all 7 active files in one shot, with snapshots preserved. Same for Jonathon name correction. Demonstrates the substrate-as-canonical-truth pattern.

## Operational health

- **Hub link audit**: 20/20 referenced URLs return HTTP 200 — no broken links.
- **Name stragglers**: 0 active occurrences of "Jonathan" or "Jon Aceves" in operational files (the one hit is the deliberate "Jon colloquial / Jonathon formal" convention line).
- **Peter Scott Monday stragglers**: 0 in current operational files. One reference in `personal/friends-meeting-prep-2026/v3.1-supplements.md:369` is in a historical "files produced tonight" status section — describes prep file that was made at 4:54 AM, not a live claim about today's calendar. Snapshots files preserve original Monday wording (correct behavior).
- **TODO/FIXME markers**: 0 across substrate.

## Still pending for tonight (~7:00–8:00 PM session)

From the hub schedule + status tracker:

1. **SS-Q010 quote** — formalize Aceves paint quote in manage app ($70/hr, est 8-10 hrs, $560-700 + materials)
2. **Jonathon name correction in manage app** — customer record formal-name update (mirrors the substrate-side correction already shipped)
3. **CeCe convo agenda** — vet records, wedding outfit, tax meeting schedule
4. **Planning chat handoff** — any deferred decisions from today's print/paint work

## Tomorrow (Tuesday) queue

- Aceves paint second day: baseboards, trim, radiator, spatter cleanup, door 2nd coat, touch-up survey
- Peter Scott shed appointment (time TBD — Sam to confirm with Peter)
- Pressure wash rug on deck
- Sherwin-Williams 50% bulk order batching decision

## This week

- Insurance research / setup session
- Tax meeting with CeCe (this week)
- Thursday 5/14 11:00 AM — Therapy with Catherine Howe (recurring)
- Pittsburgh trip prep (Friday 5/15 deadline for Pirates+Phillies prints — currently on track)
